January 29, 2013
A 35-metre turbine has collapsed near Holsworthy leaving the tower lying on the ground.
The turbine at East Ash Farm in Bradworthy was erected in 2010 by Dulas Ltd.
Dulas has confirmed this morning that a “complication” has occurred with the turbine and the situation is currently being investigated. They did not want to comment further.
The Endurance Wind Power E-3120 turbine, which was the first model of its kind to be erected in the country, has a five year warranty.